[nightly] 14-May-2005 build of HEAD on i386-unknown-linux
(cam-02-unx.europe.corp.microsoft.com)
GHC Nightly Builds
simonmar at microsoft.com
Sat May 14 22:49:48 EDT 2005
Build description = HEAD on i386-unknown-linux (cam-02-unx.europe.corp.microsoft.com)
Build location = /playpen/ghc/nightly/HEAD-cam-02-unx
Build config file = /home/simonmar/nightly/site/msrc/conf-HEAD-cam-02-unx
Nightly build started on cam-02-unx at Sat May 14 19:00:01 BST 2005.
**** checking out new source tree ... cvs server: cannot open directory /cvs/fptools/nofib/PRIVATE: Permission denied
cvs server: skipping directory nofib/PRIVATE
ok. (GHC Version 6.5.20050514)
**** Building stage 1 compiler ... ok.
**** Building stage 2 compiler ... ok.
**** Building stage 3 compiler ... ok.
**** building source distribution ... failed.
**** building testsuite tools ... ok.
**** running tests ... ok (summary below).
**** building compiler binary distribution ... ok.
**** running nofib (-O) ... ok.
**** running nofib (-O -fasm) ... ok. (4 failures)
**** running nofib (-O -prof -auto-all) ... ok.
**** running nofib (-O -prof -auto-all -fasm) ... ok. (4 failures)
**** running nofib (-fasm) ... ok. (4 failures)
**** running nofib (-unreg) ... ok.
**** publishing distfiles ... ok.
**** publishing logs ... ok.
Logs are at http://www.haskell.org/ghc/dist/current/logs
Dists are at http://www.haskell.org/ghc/dist/current/dist
All done!
Nightly build finished successfully at Sun May 15 03:49:48 BST 2005
------------- GHC Test summary ---------------------
OVERALL SUMMARY for test run started at Sat May 14 22:12:53 BST 2005
1283 total tests, which gave rise to
6678 test cases, of which
0 caused framework failures
1192 were skipped
5431 expected passes
43 expected failures
0 unexpected passes
12 unexpected failures
Unexpected failures:
cabal01(normal)
ffi002(normal)
ffi002(opt)
ffi002(optasm)
ffi002(unreg)
ffi002(threaded)
conc036(ghci)
rebindable1(normal)
TH_reifyType2(normal)
TH_genEx(normal)
tc095(opt)
tc095(optasm)
----------------------------------------------------
Nightly run ended at Sun May 15 03:49:48 BST 2005
More information about the Cvs-ghc
mailing list