[nightly] 26-Jun-2009 build of HEAD on i386-unknown-linux
(cam-02-unx.europe.corp.microsoft.com)
GHC Build Reports
ghcbuild at microsoft.com
Sat Jun 27 02:25:08 EDT 2009
Build description = HEAD on i386-unknown-linux (cam-02-unx.europe.corp.microsoft.com)
Build location = /playpen/simonmar/nightly/HEAD
Build config file = /home/simonmar/nightly/site/msrc/conf-HEAD-cam-02-unx
Nightly build started on cam-02-unx at Fri Jun 26 18:00:01 BST 2009.
**** checking out new source tree ... warning: . already present; omitting
ok. (GHC Version 6.11.20090626)
**** Building stage 1 compiler ... ok.
**** Building stage 2 compiler ... ok.
**** Building stage 3 compiler ... ok.
**** building testsuite tools ... ok.
**** running tests ... ok (summary below).
**** building compiler binary distribution ... ok.
**** uploading binary distribution ... ok.
**** running nofib (-O) ... ok. (5 failures)
**** running nofib (-O -fasm) ... ok. (5 failures)
**** running nofib (-O -prof -auto-all) ... ok. (6 failures)
**** running nofib (-O -prof -auto-all -fasm) ... ok. (6 failures)
**** running nofib (-fasm) ... ok. (5 failures)
**** running nofib (-unreg) ... failed.
**** publishing logs ... ok.
Logs are at http://www.haskell.org/ghc/dist/current/logs
Dists are at http://www.haskell.org/ghc/dist/current/dist
Docs are at http://www.haskell.org/ghc/dist/current/docs
All done!
Nightly build finished successfully at Sat Jun 27 07:42:21 BST 2009
------------- GHC Test summary ---------------------
OVERALL SUMMARY for test run started at Sat Jun 27 00:51:39 BST 2009
2365 total tests, which gave rise to
12584 test cases, of which
0 caused framework failures
2462 were skipped
9773 expected passes
322 expected failures
0 unexpected passes
27 unexpected failures
Unexpected failures:
T1969(normal)
T3016(optc,profc)
barton-mangler-bug(profc)
bug1010(ghci)
drv001(profc,profasm)
num009(profasm,profthreaded)
space_leak_001(profasm,profthreaded)
spec001(normal,optc,hpc,optasm,profc,profasm)
user001(normal,optc,hpc,optasm,profc,profasm,ghci,threaded1,threaded2,profthreaded)
----------------------------------------------------
Nightly run ended at Sat Jun 27 07:42:21 BST 2009
More information about the Cvs-ghc
mailing list