[nightly] 21-May-2010 build of STABLE on i386-unknown-linux
(cam-02-unx.europe.corp.microsoft.com)
GHC Build Reports
ghcbuild at microsoft.com
Fri May 21 23:52:36 EDT 2010
Build description = STABLE on i386-unknown-linux (cam-02-unx.europe.corp.microsoft.com)
Build location = /playpen/simonmar/nightly/STABLE
Build config file = /home/simonmar/nightly/site/msrc/conf-STABLE-cam-02-unx
Nightly build started on cam-02-unx at Fri May 21 18:10:01 BST 2010.
**** checking out new source tree ... warning: . already present; omitting
ok.
**** Building stage 1 compiler ... ok.
GHC Version 6.12.2.20100521
**** Building stage 2 compiler ... ok.
**** Building stage 3 compiler ... ok.
**** building testsuite tools ... ok.
**** running tests ... ok (summary below).
**** building compiler binary distribution ... ok.
**** uploading binary distribution ... ok.
**** running nofib (-O -fasm) ... ok. (1 failures)
**** running nofib (-O -fvia-C) ... ok. (1 failures)
**** running nofib (-O -prof -auto-all -fasm) ... ok. (2 failures)
**** running nofib (-O -prof -auto-all -fvia-C) ... ok. (1 failures)
**** publishing logs ... ok.
Logs are at http://www.haskell.org/ghc/dist/stable/logs
Dists are at http://www.haskell.org/ghc/dist/stable/dist
Docs are at http://www.haskell.org/ghc/dist/stable/docs
All done!
Nightly build finished successfully at Sat May 22 05:26:29 BST 2010
------------- GHC Test summary ---------------------
OVERALL SUMMARY for test run started at Fri May 21 22:00:58 BST 2010
2383 total tests, which gave rise to
13185 test cases, of which
0 caused framework failures
2787 were skipped
10045 expected passes
323 expected failures
0 unexpected passes
30 unexpected failures
Unexpected failures:
3816(normal,optc,hpc,optasm,profc,profasm,ghci,threaded1,threaded2,dyn,profthreaded)
T1969(normal)
concprog001(ghci)
hReady002(ghci)
joao-circular(profc)
signals002(threaded1,threaded2,profthreaded)
signals004(profthreaded)
user001(normal,optc,hpc,optasm,profc,profasm,ghci,threaded1,threaded2,dyn,profthreaded)
----------------------------------------------------
Nightly run ended at Sat May 22 05:26:29 BST 2010
More information about the Cvs-ghc
mailing list